Smith point trailer was deployed.
Instruments were calibrated 3/21/19 before deployment
O3 slope: 0.965
NO slope: 1.18
NO2 Slope: 1.17
CE: 0.714
Site calibration gas initial pressure was 1520 psi
Sprayed for ants
Installed a new Teflon filter